We have been busy working on the house since we got back
from vacation. We have our bathroom vanity, tub and toilet bought and stored in
the garage. We’ve purchased our gas fireplace insert and are waiting on it to
be delivered and installed next week. Dennis had to “wire” the fireplace before
that happens, which turned into about a 2 day job. He ended up drilling through
about 15” of ceramic in order to run a wire for the outlet. He also spent about
$100 on drill bits and ruined a couple of them. But he finally got through and
the fireplace is ready for the insert. We are really excited about getting
that! I don’t like wood-burning fireplaces, so we haven’t ever used ours. I
look forward to being able to have a nice, warm gas fire when the weather gets
cold. We expect to use it to heat the living area of the house most of the
time. So it will be both useful and aesthetically pleasing! (Neither of which
the old one was!)
![]() |
| ready for insert |
![]() |
| picture of insert from brochure |
The hall bathroom is completely gutted. Dennis needs to
rewire it and then start working on the sheetrock. It shouldn’t take too long,
since it is such a small room. After the walls are finished, we’ll lay the
floor tile. Then we can install the fixtures. The vanity we bought is from a collection
that also includes a wall cabinet and framed mirror that we also plan to
purchase. We opted not to make a opening into the hall closet. I should be able
to store enough towels in the wall cabinet for company needs and just replenish
them as needed. We are hoping to have the bathroom functional by Thanksgiving…at
least the sink and toilet! I know that I am spoilt, but I really miss having
two working bathrooms. I definitely want to have them both before we have any
company!
![]() |
| gutted bathroom |
After we get the fireplace installed, the living room will
pretty much be finished, other than the carpet (which will be the absolute last
thing we do). After the bathroom is completed. Dennis will take some time off
for hunting season. He may work on the doors for the a/c unit and water heater.
He plans to build them himself. The only ones we could find that are premade
have louvers, and I REALLY don’t like louvers. He plans to make them using a
similar design to our other inside doors, but cut out the routed area and
replace them with metal grillwork for ventilation. After hunting season, he’ll
move on to the back room, which I plan to make into the grandkid room. That
will just leave the master bedroom/bath! The end is finally in sight. I’m
hoping that 2021 will be our final year of renovation!
Well that is all the news on our home improvement project!
What’s new with you?



No comments:
Post a Comment